● Licensed & Insured · CSLB Lic. #1158371(909) 208-8655
Landeros & Sons ConstructionLanderos & SonsCONSTRUCTION Call (909) 208-8655
Bathroom Remodeling · Inland Empire · CSLB Lic. #1158371

A bathroom remodel with a real price and a real finish date.

Full bathrooms typically run $15,000–$45,000 here. You get an itemized quote before we start, one family running the job, and a shower that's flood-tested before a single tile goes on.

Free in-home estimates · We pull the permits · Se habla español

Free Bathroom Estimate

We'll come out, measure, and give you an itemized price. No pressure.

Prefer to talk? Call or text (909) 208-8655

30+ YearsBUILDING THE IE
LicensedCSLB #1158371 · INSURED
FamilyFATHER & SONS
FreeESTIMATES & WALK-THROUGHS
Real numbers, up front

What a bathroom costs in the Inland Empire

These are typical 2026 ranges for our area. Your free estimate gives you an exact, itemized number for your bathroom.

ProjectTypical rangeTimelineIncludes
Bathroom refresh$6,000 – $12,0001–2 weeksNew vanity, toilet, fixtures and paint; the tile stays
Full hall bathroom$15,000 – $25,0003–4 weeksDown to the studs: tub or shower, tile, plumbing, electrical, fan
Primary bathroom$28,000 – $45,000+4–6 weeksCustom tile shower, double vanity, glass, lighting
Every quote is itemized. You see where every dollar goes before we start, and any change is written and signed before extra work begins.
✓Shower pan flood-tested for 24 hours before tile
✓Tile set by our own lead setter, not whoever is available that week
✓Plumbing and electrical by licensed trades, with permits pulled by us when the job needs one
✓Dust protection and daily cleanup
Our work

Tile work you can't get from a kit

Hand-set stone, arches and niches, with the waterproofing done right underneath.

The process

How your bathroom gets built

STEP 1

Free in-home estimate

We measure, check the plumbing and fan, and talk through what you want.

STEP 2

Itemized quote

Labor, tile, fixtures and glass listed line by line. You pick finishes.

STEP 3

Build

Demolition, plumbing and electrical, waterproofing and flood test, tile, then vanity and fixtures.

STEP 4

Glass & final walk

Glass goes in, we walk the room together, and we fix anything on the list before the last payment.

Bathroom questions

Straight answers

How long will I be without the bathroom?

A full remodel is about 3–4 weeks of work. Custom glass is measured after the tile is finished and usually arrives 1–2 weeks later. You can use the shower with a curtain while you wait.

Do I need a permit?

If we move or add plumbing, add electrical circuits, or change walls, yes. We pull the permit and schedule the inspections. Replacing a vanity or toilet in the same spot usually doesn't need one.

How do you waterproof the shower?

Every shower gets a hot-mop or membrane pan, and we flood-test it for 24 hours before any tile goes on. Walls get cement backer board, not drywall.

Can I supply my own tile or fixtures?

Yes. Send us the links before you order and we'll check the quantities and that the parts fit your plumbing.

I only want to replace the tub with a shower. Do you do that?

Yes. See showers and tub conversions for pricing and timelines.

How much do I pay up front?

California law limits the down payment on a home improvement contract to $1,000 or 10% of the price, whichever is less. After that you pay in stages, only as each stage of work is finished.

Where we work

Bathroom remodels across the Inland Empire

FontanaRancho CucamongaUplandOntarioEastvaleChino HillsClaremontRialtoBloomingtonJurupa ValleySan BernardinoRiversideColton
Free estimates · Se habla español

Let's look at your bathroom.

Call, text photos, or send the form. We answer 7am–9pm, every day.

📞 Call now💬 Text us